Skip to main content

Manufacturing Case Study

Client Profile

High volume beverage bottler struggling with effective startups, underdeveloped management systems and decreasing line utilization.

Solutions

  • Shutdown/Startup Standard Work (checklists)
  • Management Operating System
  • Leader Training & Development
  • Short Interval Controls
  • Pre-Shift Meeting Effectiveness
  • Shop Floor Situational Coaching
  • Visual Management
  • Root Cause Analysis

Challenge

  • Lack of understanding on how 1st-hour utilization affects the balance of the day
  • Inconsistent line clear outs and cleaning from the previous shift
  • Root cause analysis not conducted or effective for top sources of loss at startup
  • Lack of maintenance experience leading to longer diagnostic times (average tenure on the second shift is 8 months)
  • No clear line priorities for maintenance when addressing simultaneous problems on multiple lines
  • Daily Directional Setting Meetings (DDS) not driving actions; just reporting previous day’s results
  • Actions to address performance gaps not well defined or followed up on

Approach

  • Introduced KPIs and their use in driving actions to address poor performance, highlighting the importance of the 1st hour and its impact on the first shift
  • Addressed poor line clear outs and cleaning on the previous shift through the use of shutdown checklists
  • Focused on effective pre-shift meetings and starting the line on time
  • Coached and audited the effective use of visual management tools and behaviors
  • Established line priorities for maintenance
  • Coached effective meeting behaviors
  • Introduced and coached effective use of a formal action log
  • Designed and coached leader standard work for supervisors
  • Facilitated post-mortem events on days with 1st-hour utilization below target

Results

  • Achieved a 34% improvement over baseline in 1st-hour utilization
  • Overall line utilization improved by 19% over baseline
  • Pre-shift meetings focus on variances and the actions required to correct them
  • Pre-shift actions are added to the main DDS action log
  • Supervisors manage consistently across shifts, utilizing leader standard work to ensure active supervision daily
  • Hour-by-hour visual boards track performance, changeover times, and GMP/housekeeping compliance
  • Recurring issues and top sources of losses are captured and prioritized on the action log